Gallery
Guangzhou Gymnasium gallery
Guangzhou Gymnasium image
saved.archi
your architecture companion
Work
The Guangzhou Gymnasium is an indoor arena in Guangzhou. The arena is used as a concert venue and for sporting events such as arena football, basketball, badminton and table tennis. It was constructed between 11 February 1999 and opened on 30 June 2001, with a seating capacity of 10,000. It was designed by Paul Andreu. it covers an area of 240,000 square meters and has a construction area of nearly 100,000 square me…
Gallery
Hero image, caption, credit, source, and license are attached to the work record.
Gallery
Guangzhou Gymnasium image
1
Architects
1
Bureaus
0
Books
Phase 1 site intelligence
Runtime context from mapping, climate, transit, and access providers
Loading
Pulling place, climate, and nearby mobility signals for this work.
Phase 2 heritage and risk
Source review, archive context, seismic, federal, coastal, and soil signals around the work
Loading
Pulling project-source review, archive traces, seismic history, federal context, and soil classification.
Phase 3 materials and carbon
Material palette, carbon research, and classification scaffolding around the work
Loading
Normalizing the palette, checking public classification systems, and preparing product-level research handoffs.
Architects
People attached to this work in the current corpus
Bureaus
Practices attached to this work in the current corpus