| Type | work | bureau |
|---|
| Year / years | 1961-1982 | 1980 |
|---|
| Place | Dhaka, Dhaka Division, Bangladesh | London, England, United Kingdom |
|---|
| Place context | সংসদ ভবন সড়ক, সোবহানবাগ, ঢাকা, ঢাকা বিভাগ, বাংলাদেশ | Representative site: Mount Walk, Knightsbridge, City of Westminster, England, United Kingdom |
|---|
| Climate | 27°C · 12.7h daylight · 7 km/h wind | 15°C · 13.8h daylight · 15 km/h wind · via Serpentine Galleries |
|---|
| Focus | Parliament building | 24 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Serpentine Galleries
- Vitra Fire Station
- Contemporary Arts Center
- BMW Central Building
|
|---|
| Typologies | - parliament
- civic building
- government building
| - landscape
- fire station
- deconstructivism
- industrial building
- museum
- building
- performance venue
- education
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete and Stone look like the main embodied-carbon drivers in the current palette. | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Publicly accessible | 12 of 12 recorded works are publicly accessible |
|---|
| Related books | | No linked books yet. |
|---|