| Type | work | bureau |
|---|
| Year / years | Unknown | 1920 |
|---|
| Place | Alberta, Alberta, Canada | Tel Aviv, Tel Aviv, Israel |
|---|
| Place context | Bow River Path (North), Sunnyside, Calgary, Alberta, Canada | Representative site: שדרות רוטשילד, לב תל-אביב, תל־אביב–יפו, מחוז תל אביב, ישראל |
|---|
| Climate | -3°C · 13.9h daylight · 17 km/h wind | 22°C · 13.0h daylight · 5 km/h wind · via Levin House (Tel Aviv) |
|---|
| Focus | Architecture | 3 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Levin House (Tel Aviv)
- Beit HaAmudim
- Great Synagogue (Tel Aviv)
|
|---|
| Typologies | | - house
- civic building
- performance venue
- tower
|
|---|
| Materials | Not recorded yet. | Not recorded yet. |
|---|
| Carbon signals | infrastructure gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | house, civic building, performance venue, and tower gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | No levers surfaced yet. | No levers surfaced yet. |
|---|
| Accessibility | Access not recorded | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|