saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Crasus Dome Oita in Oita, Japan
Crasus Dome Oita

1998 · Oita, Oita, Japan

Crasus Dome Oita image

Multi-purpose stadium in Ōita, Japan

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Crasus Dome Oita

Oita, Oita, Japan · Exact work coordinates

OpenStreetMap
Field
Crasus Dome OitaCrasus Dome Oita

1998 · Oita, Oita, Japan

Yamasaki & AssociatesYamasaki & Associates

1949 · Detroit, Michigan, United States

Typeworkbureau
Year / years19981949
PlaceOita, Oita, JapanDetroit, Michigan, United States
Place contextOita, Oita, JapanRepresentative site: St. Louis, St. Louis, United States
Climate21°C · 13.2h daylight · 8 km/h wind14°C · 13.4h daylight · 8 km/h wind · via Pruitt–Igoe
FocusArchitecture24 works in corpus
Architects
  • Kisho Kurokawa
  • Minoru Yamasaki
Linked context

Bureaus

  • Kisho Kurokawa Architect & Associates

Notable works

  • Pruitt–Igoe
  • One Woodward Avenue
  • 1200 Fifth
  • Fairmont Century Plaza
Typologies
  • sports venue
  • housing
  • tower
  • office
  • performance venue
  • hospitality
  • building
  • house
  • campus building
Materials

Not recorded yet.

  • timber
  • steel
  • glass
  • concrete
Carbon signals

sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded5 of 5 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.