saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Estádio José Alvalade in Lumiar, Portugal
Estádio José Alvalade

2003 · Lumiar, Lumiar, Portugal

Estádio José Alvalade image

Football stadium in Lisbon, Portugal

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Estádio José Alvalade

Lumiar, Lumiar, Portugal · Exact work coordinates

OpenStreetMap
Field
Estádio José AlvaladeEstádio José Alvalade

2003 · Lumiar, Lumiar, Portugal

WOHA

Singapore, Singapore

Typeworkbureau
Year / years2003Unrecorded
PlaceLumiar, Lumiar, PortugalSingapore, Singapore
Place contextLumiar, Lumiar, PortugalRepresentative site: Singapore, Singapore
Climate18°C · 13.5h daylight · 25 km/h wind28°C · 12.2h daylight · 5 km/h wind · via Bras Basah Rapid Transit Station
FocusArchitecture7 works in corpus
Architects
  • Tomas Taveira

No architects linked yet.

Linked context

Bureaus

  • Atelier Tomás Taveira

Notable works

  • Bras Basah Rapid Transit Station
  • The Met
  • 48 North Canal Road
  • Goodwood Residence
Typologies
  • sports venue
  • infrastructure
  • transportation
  • infrastructures
  • offices
  • office buildings
  • residential
  • housing
  • apartments
Materials

Not recorded yet.

  • concrete
  • glass
  • other
  • stone
  • steel
Carbon signals

sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.