saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Genoa-Saint George Bridge in Genoa, Italy
Genoa-Saint George Bridge

2019 · Genoa, Genoa, Italy

Genoa-Saint George Bridge image

Motorway viaduct in Genoa, Italy

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Genoa-Saint George Bridge

Genoa, Genoa, Italy · Exact work coordinates

OpenStreetMap
Field
Genoa-Saint George BridgeGenoa-Saint George Bridge

2019 · Genoa, Genoa, Italy

Walter GropiusWalter Gropius

1919 · Berlin, Berlin, Germany

Typeworkbureau
Year / years20191919
PlaceGenoa, Genoa, ItalyBerlin, Berlin, Germany
Place contextGenoa, Genoa, ItalyRepresentative site: Alfeld (Leine), Alfeld (Leine), Germany
Climate18°C · 13.7h daylight · 6 km/h wind7°C · 14.2h daylight · 11 km/h wind · via Fagus Factory
FocusArchitecture9 works in corpus
Architects
  • Renzo Piano
  • Walter Gropius
Linked context

Bureaus

  • Renzo Piano Building Workshop

Notable works

  • Fagus Factory
  • Sommerfeld House
  • 66 Old Church Street, Chelsea
  • Gropius House
Typologies
  • infrastructure
  • building
  • education
  • house
  • church
  • sacred space
  • museum
  • infrastructure
  • tower
Materials
  • concrete
  • steel
  • glass
Carbon signals

Concrete and Steel look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel

Glass look like the main embodied-carbon drivers in the current palette.

  • Glass
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded5 of 5 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.