| Type | work | bureau |
|---|
| Year / years | 1980 | 1919 |
|---|
| Place | Ried-Brig, Ried-Brig, Switzerland | Berlin, Berlin, Germany |
|---|
| Place context | Ganterhöhenweg, Ried-Brig, Valais/Wallis, Schweiz/Suisse/Svizzera/Svizra | Representative site: Hannoversche Straße, Alfeld (Leine), Niedersachsen, Deutschland |
|---|
| Climate | 9°C · 13.4h daylight · 12 km/h wind | 11°C · 13.6h daylight · 12 km/h wind · via Fagus Factory |
|---|
| Focus | Architecture | 5 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Fagus Factory
- Sommerfeld House
- Bauhaus Archive
- Bauhaus Dessau
|
|---|
| Typologies | | - building
- education
- house
- museum
- memorial
|
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete look like the main embodied-carbon drivers in the current palette. | building, education, house, and museum gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
| No levers surfaced yet. |
|---|
| Accessibility | Access not recorded | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|