saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Exterior view of Casa de Vidro in Sao Paulo, showing the glass volume lifted above the wooded site.
Casa de Vidro

1951 · Sao Paulo, Brazil

Casa de Vidro exterior view

Exterior view of Casa de Vidro in Morumbi, Sao Paulo.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Casa de Vidro

Sao Paulo, Brazil · Exact work coordinates

OpenStreetMap
Field
Casa de VidroCasa de Vidro

1951 · Sao Paulo, Brazil

Walter GropiusWalter Gropius

1919 · Berlin, Berlin, Germany

Typeworkbureau
Year / years19511919
PlaceSao Paulo, BrazilBerlin, Berlin, Germany
Place contextSao Paulo, BrazilRepresentative site: Alfeld (Leine), Alfeld (Leine), Germany
Climate16°C · 11.5h daylight · 5 km/h wind7°C · 14.2h daylight · 14 km/h wind · via Fagus Factory
FocusHouse9 works in corpus
Architects
  • Lina Bo Bardi
  • Walter Gropius
Linked context

Bureaus

  • Studio Lina Bo Bardi

Notable works

  • Fagus Factory
  • Sommerfeld House
  • 66 Old Church Street, Chelsea
  • Gropius House
Typologies
  • residence
  • house
  • building
  • education
  • house
  • church
  • sacred space
  • museum
  • infrastructure
  • tower
Materials
  • glass
  • concrete
  • steel
  • glass
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Glass look like the main embodied-carbon drivers in the current palette.

  • Glass
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible5 of 5 recorded works are publicly accessible
Related books

No linked books yet.