saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Quinta Monroy

2003 · Iquique, Tarapaca Region, Chile

Iquique, Tarapaca Region, Chile

Climate unavailable

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Quinta Monroy

Iquique, Tarapaca Region, Chile · Exact work coordinates

OpenStreetMap

Quinta Monroy

Image 1

Iquique, Tarapaca Region, Chile

Climate: Climate unavailable

Mapping: Exact work coordinates

Field
Quinta Monroy

2003 · Iquique, Tarapaca Region, Chile

Vilanova ArtigasVilanova Artigas

1937 · Sao Paulo, Sao Paulo, Brazil

Typeworkbureau
Year / years20031937
PlaceIquique, Tarapaca Region, ChileSao Paulo, Sao Paulo, Brazil
Place contextIquique, Tarapaca Region, ChileRepresentative site: São Paulo, São Paulo, Brazil
ClimateClimate unavailableClimate unavailable · via Faculty of Architecture and Urbanism, University of São Paulo
FocusAffordable housing2 works in corpus
Architects
  • Alejandro Aravena
  • Joao Batista Vilanova Artigas
Linked context

Bureaus

  • ELEMENTAL

Notable works

  • Faculty of Architecture and Urbanism, University of São Paulo
  • Estádio do Morumbi
Typologies
  • housing
  • social housing
  • residential
  • education
  • campus building
  • sports venue
Materials
  • concrete
  • masonry

Not recorded yet.

Carbon signals

Concrete and Brick look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick

education, campus building, and sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.

No levers surfaced yet.

AccessibilityAccess not recordedAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.