saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
2 World Trade Center (1971–2001)

1971 · New York City, New York City, United States

Greenwich Street, Manhattan, Tribeca, New York, New York, United States

8°C · 13.5h daylight · 10 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

2 World Trade Center (1971–2001)

New York City, New York City, United States · Exact work coordinates

OpenStreetMap

2 World Trade Center (1971–2001)

Image 1

Greenwich Street, Manhattan, Tribeca, New York, New York, United States

Climate: 8°C · 13.5h daylight · 10 km/h wind

Mapping: Exact work coordinates

Field
2 World Trade Center (1971–2001)

1971 · New York City, New York City, United States

Vastu-Shilpa ConsultantsVastu-Shilpa Consultants

1955 · Ahmedabad, Gujarat, India

Typeworkbureau
Year / years19711955
PlaceNew York City, New York City, United StatesAhmedabad, Gujarat, India
Place contextGreenwich Street, Manhattan, Tribeca, New York, New York, United StatesRepresentative site: Netaji Subhash Chandra Road, Kochrab, Gujarat, India
Climate8°C · 13.5h daylight · 10 km/h wind25°C · 12.8h daylight · 6 km/h wind · via Tagore Memorial Hall
FocusArchitecture5 works in corpus
Architects
  • Minoru Yamasaki
  • Balkrishna Doshi
Linked context

Bureaus

  • Yamasaki & Associates

Notable works

  • Tagore Memorial Hall
  • Indian Institute of Management Bangalore
  • Aranya Low Cost Housing
  • Amdavad ni Gufa
Typologies
  • tower
  • memorial
  • education
  • campus building
  • institutional building
  • housing
  • social housing
  • incremental urbanism
  • gallery
Materials

Not recorded yet.

  • stone
  • concrete
  • landscape
  • brick
  • tile
Carbon signals

tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Brick, and Landscape look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick
  • Landscape
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Use classification and product-level EPD research to place this material more precisely.
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
AccessibilityAccess not recorded4 of 4 recorded works are publicly accessible
Related books

No linked books yet.