saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Villa Bloemenwerf in Uccle, Belgium
Villa Bloemenwerf

1895 · Uccle, Uccle, Belgium

Villa Bloemenwerf image

Historic Art Nouveau house in Brussels, Belgium

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Villa Bloemenwerf

Uccle, Uccle, Belgium · Exact work coordinates

OpenStreetMap
Field
Villa BloemenwerfVilla Bloemenwerf

1895 · Uccle, Uccle, Belgium

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1895Unrecorded
PlaceUccle, Uccle, BelgiumArnhem, Gelderland, The Netherlands
Place contextUccle, Uccle, BelgiumRepresentative site: Arnhem, Arnhem, Netherlands
Climate13°C · 14.1h daylight · 10 km/h wind13°C · 14.2h daylight · 9 km/h wind · via Arnhem Centraal railway station
FocusHouse9 works in corpus
Architects
  • Henry van de Velde
  • Ben van Berkel
Linked context

Bureaus

  • Atelier Henry van de Velde

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • house
  • landscape
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

house and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.