saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Torre Altus in Mexico City, Mexico
Torre Altus

1998 · Mexico City, Mexico City, Mexico

Torre Altus image

Residential condominiums in Mexico

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Torre Altus

Mexico City, Mexico City, Mexico · Exact work coordinates

OpenStreetMap
Field
Torre AltusTorre Altus

1998 · Mexico City, Mexico City, Mexico

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1998Unrecorded
PlaceMexico City, Mexico City, MexicoArnhem, Gelderland, The Netherlands
Place contextMexico City, Mexico City, MexicoRepresentative site: Arnhem, Arnhem, Netherlands
Climate15°C · 12.7h daylight · 3 km/h wind11°C · 14.2h daylight · 13 km/h wind · via Arnhem Centraal railway station
FocusHousing9 works in corpus
Architects
  • Augusto H. Alvarez
  • Ben van Berkel
Linked context

Bureaus

  • Augusto H. Álvarez

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • housing
  • tower
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

housing and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.