saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Tan-y-Deri in Wyoming, United States
Tan-y-Deri

1908 · Wyoming, Wyoming, United States

Tan-y-Deri image

House in Wyoming, Wisconsin

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Tan-y-Deri

Wyoming, Wyoming, United States · Exact work coordinates

OpenStreetMap
Field
Tan-y-DeriTan-y-Deri

1908 · Wyoming, Wyoming, United States

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1908Unrecorded
PlaceWyoming, Wyoming, United StatesArnhem, Gelderland, The Netherlands
Place contextWyoming, Wyoming, United StatesRepresentative site: Arnhem, Arnhem, Netherlands
Climate13°C · 13.7h daylight · 13 km/h wind14°C · 14.3h daylight · 13 km/h wind · via Arnhem Centraal railway station
FocusHouse9 works in corpus
Architects
  • Frank Lloyd Wright
  • Ben van Berkel
Linked context

Bureaus

  • Frank Lloyd Wright Foundation

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • house
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

house gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.