saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Seoul Olympic Stadium in Seoul, South Korea
Seoul Olympic Stadium

1984 · Seoul, Seoul, South Korea

Seoul Olympic Stadium image

Stadium in Seoul, South Korea

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Seoul Olympic Stadium

Seoul, Seoul, South Korea · Exact work coordinates

OpenStreetMap
Field
Seoul Olympic StadiumSeoul Olympic Stadium

1984 · Seoul, Seoul, South Korea

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1984Unrecorded
PlaceSeoul, Seoul, South KoreaArnhem, Gelderland, The Netherlands
Place contextSeoul, Seoul, South KoreaRepresentative site: Arnhem, Arnhem, Netherlands
Climate10°C · 13.4h daylight · 10 km/h wind14°C · 14.3h daylight · 13 km/h wind · via Arnhem Centraal railway station
FocusArchitecture9 works in corpus
Architects
  • Kim Swoo-geun
  • Ben van Berkel
Linked context

Bureaus

  • SPACE Group of Korea

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • sports venue
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.