saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Post Tower in Stadtbezirk Bonn, Germany
Post Tower

2002 · Stadtbezirk Bonn, Stadtbezirk Bonn, Germany

Post Tower image

Headquarters of the DHL Group

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Post Tower

Stadtbezirk Bonn, Stadtbezirk Bonn, Germany · Exact work coordinates

OpenStreetMap
Field
Post TowerPost Tower

2002 · Stadtbezirk Bonn, Stadtbezirk Bonn, Germany

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years2002Unrecorded
PlaceStadtbezirk Bonn, Stadtbezirk Bonn, GermanyArnhem, Gelderland, The Netherlands
Place contextStadtbezirk Bonn, Stadtbezirk Bonn, GermanyRepresentative site: Arnhem, Arnhem, Netherlands
Climate7°C · 14.2h daylight · 5 km/h wind5°C · 14.3h daylight · 12 km/h wind · via Arnhem Centraal railway station
FocusArchitecture9 works in corpus
Architects
  • Helmut Jahn
  • Ben van Berkel
Linked context

Bureaus

  • Murphy/Jahn

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • tower
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.