saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Opus Hong Kong in Hong Kong, People's Republic of China
Opus Hong Kong

2012 · Hong Kong, Hong Kong, People's Republic of China

Opus Hong Kong image

Building in The Peak, Hong Kong

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Opus Hong Kong

Hong Kong, Hong Kong, People's Republic of China · Exact work coordinates

OpenStreetMap
Field
Opus Hong KongOpus Hong Kong

2012 · Hong Kong, Hong Kong, People's Republic of China

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years2012Unrecorded
PlaceHong Kong, Hong Kong, People's Republic of ChinaArnhem, Gelderland, The Netherlands
Place contextHong Kong, Hong Kong, People's Republic of ChinaRepresentative site: Arnhem, Arnhem, Netherlands
Climate24°C · 12.8h daylight · 7 km/h wind6°C · 14.3h daylight · 12 km/h wind · via Arnhem Centraal railway station
FocusHousing9 works in corpus
Architects
  • Frank Gehry
  • Ben van Berkel
Linked context

Bureaus

  • Gehry Partners

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • housing
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

housing gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.