| Type | work | bureau |
|---|
| Year / years | 1928 | Unrecorded |
|---|
| Place | Stockholm, Stockholm, Sweden | Arnhem, Gelderland, The Netherlands |
|---|
| Place context | Västra Trädgårdsgatan, Norrmalm, Klara, Stockholm, Sverige | Representative site: Nieuwe Stationsstraat, Stationsplein, Arnhem, Gelderland, Nederland |
|---|
| Climate | 10°C · 14.7h daylight · 9 km/h wind | 14°C · 14.0h daylight · 8 km/h wind · via Arnhem Centraal railway station |
|---|
| Focus | Office building | 9 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works - Arnhem Centraal railway station
- Rijksmuseum Twenthe
- Mercedes-Benz Museum
- Erasmusbrug
|
|---|
| Typologies | | - building
- museum
- infrastructure
- housing
- tower
- transportation
- train station
|
|---|
| Materials | Not recorded yet. | |
|---|
| Carbon signals | office gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | No levers surfaced yet. | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Access not recorded | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|