saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
M9

2018 · Mestre, Veneto, Italy

Mestre, Veneto, Italy

Climate unavailable

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

No coordinates are recorded for the current selection yet.

M9

Image 1

Mestre, Veneto, Italy

Climate: Climate unavailable

Mapping: Coordinates not recorded

Field
M9

2018 · Mestre, Veneto, Italy

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years2018Unrecorded
PlaceMestre, Veneto, ItalyArnhem, Gelderland, The Netherlands
Place contextMestre, Veneto, ItalyRepresentative site: Arnhem, Arnhem, Netherlands
ClimateClimate unavailable17°C · 14.0h daylight · 5 km/h wind · via Arnhem Centraal railway station
FocusMuseum9 works in corpus
Architects

No architects linked yet.

  • Ben van Berkel
Linked context

Bureaus

No linked context yet.

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • museum
  • history museum
  • cultural building
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials
  • terracotta
  • glass
  • concrete
  • glass
  • steel
  • concrete
Carbon signals

Concrete, Brick, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Brick
  • Glass

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Review masonry extent, reuse opportunities, and alternate assemblies where the design language allows it.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.