saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

LUMA Tower in Arles, France
LUMA Tower

2021 · Arles, Arles, France

LUMA Tower image

Tower in Arles, France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

LUMA Tower

Arles, Arles, France · Exact work coordinates

OpenStreetMap
Field
LUMA TowerLUMA Tower

2021 · Arles, Arles, France

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years2021Unrecorded
PlaceArles, Arles, FranceArnhem, Gelderland, The Netherlands
Place contextArles, Arles, FranceRepresentative site: Arnhem, Arnhem, Netherlands
Climate23°C · 13.7h daylight · 11 km/h wind9°C · 14.2h daylight · 14 km/h wind · via Arnhem Centraal railway station
FocusArchitecture9 works in corpus
Architects
  • Frank Gehry
  • Ben van Berkel
Linked context

Bureaus

  • Gehry Partners

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • tower
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.