saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Ibirapuera Park in São Paulo, Brazil
Ibirapuera Park

1954 · São Paulo, São Paulo, Brazil

Ibirapuera Park image

Urban park in São Paulo

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Ibirapuera Park

São Paulo, São Paulo, Brazil · Exact work coordinates

OpenStreetMap
Field
Ibirapuera ParkIbirapuera Park

1954 · São Paulo, São Paulo, Brazil

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1954Unrecorded
PlaceSão Paulo, São Paulo, BrazilArnhem, Gelderland, The Netherlands
Place contextSão Paulo, São Paulo, BrazilRepresentative site: Arnhem, Arnhem, Netherlands
Climate17°C · 11.4h daylight · 3 km/h wind3°C · 14.2h daylight · 5 km/h wind · via Arnhem Centraal railway station
FocusLandscape project9 works in corpus
Architects
  • Oscar Niemeyer
  • Ben van Berkel
Linked context

Bureaus

  • Oscar Niemeyer

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • landscape
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.