saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Högalid Church in Stockholm, Sweden
Högalid Church

1923 · Stockholm, Stockholm, Sweden

Högalid Church image

Church in Stockholm, Sweden

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Högalid Church

Stockholm, Stockholm, Sweden · Exact work coordinates

OpenStreetMap
Field
Högalid ChurchHögalid Church

1923 · Stockholm, Stockholm, Sweden

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1923Unrecorded
PlaceStockholm, Stockholm, SwedenArnhem, Gelderland, The Netherlands
Place contextStockholm, Stockholm, SwedenRepresentative site: Arnhem, Arnhem, Netherlands
Climate7°C · 15.1h daylight · 14 km/h wind6°C · 14.4h daylight · 12 km/h wind · via Arnhem Centraal railway station
FocusSacred building9 works in corpus
Architects
  • Ivar Tengbom
  • Ben van Berkel
Linked context

Bureaus

  • Ivar Tengbom

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • church
  • sacred space
  • civic building
  • landscape
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

church, sacred space, civic building, and landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.