saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Golden Angel in Prague 5, Czech Republic
Golden Angel

2000 · Prague 5, Prague 5, Czech Republic

Golden Angel image

Office complex in Prague, Czech Republic

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Golden Angel

Prague 5, Prague 5, Czech Republic · Exact work coordinates

OpenStreetMap
Field
Golden AngelGolden Angel

2000 · Prague 5, Prague 5, Czech Republic

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years2000Unrecorded
PlacePrague 5, Prague 5, Czech RepublicArnhem, Gelderland, The Netherlands
Place contextPrague 5, Prague 5, Czech RepublicRepresentative site: Arnhem, Arnhem, Netherlands
Climate11°C · 14.1h daylight · 17 km/h wind13°C · 14.2h daylight · 9 km/h wind · via Arnhem Centraal railway station
FocusArchitecture9 works in corpus
Architects
  • Jean Nouvel
  • Ben van Berkel
Linked context

Bureaus

  • Ateliers Jean Nouvel

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • building
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.