saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

DZ Bank Building in Bezirk Mitte, Germany
DZ Bank Building

2001 · Bezirk Mitte, Bezirk Mitte, Germany

DZ Bank Building image

Office building in Berlin, Germany

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

DZ Bank Building

Bezirk Mitte, Bezirk Mitte, Germany · Exact work coordinates

OpenStreetMap
Field
DZ Bank BuildingDZ Bank Building

2001 · Bezirk Mitte, Bezirk Mitte, Germany

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years2001Unrecorded
PlaceBezirk Mitte, Bezirk Mitte, GermanyArnhem, Gelderland, The Netherlands
Place contextBezirk Mitte, Bezirk Mitte, GermanyRepresentative site: Arnhem, Arnhem, Netherlands
Climate9°C · 14.3h daylight · 12 km/h wind11°C · 14.2h daylight · 9 km/h wind · via Arnhem Centraal railway station
FocusHousing9 works in corpus
Architects
  • Frank Gehry
  • Ben van Berkel
Linked context

Bureaus

  • Gehry Partners

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • housing
  • office
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

housing and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.