saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Church of Bethphage in Jerusalem, Israel
Church of Bethphage

1883 · Jerusalem, Jerusalem, Israel

Church of Bethphage image

Franciscan church in Jerusalem

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Church of Bethphage

Jerusalem, Jerusalem, Israel · Exact work coordinates

OpenStreetMap
Field
Church of BethphageChurch of Bethphage

1883 · Jerusalem, Jerusalem, Israel

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1883Unrecorded
PlaceJerusalem, Jerusalem, IsraelArnhem, Gelderland, The Netherlands
Place contextJerusalem, Jerusalem, IsraelRepresentative site: Arnhem, Arnhem, Netherlands
Climate11°C · 13.1h daylight · 22 km/h wind4°C · 14.2h daylight · 7 km/h wind · via Arnhem Centraal railway station
FocusHouse9 works in corpus
Architects
  • Antonio Barluzzi
  • Ben van Berkel
Linked context

Bureaus

  • Antonio Barluzzi

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • house
  • church
  • sacred space
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials
  • stone
  • glass
  • steel
  • concrete
Carbon signals

Stone look like the main embodied-carbon drivers in the current palette.

  • Stone

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Check source geography, fabrication intensity, and whether stone is structural, cladding, or finish-only.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.