saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Astrup Fearnley Museum of Modern Art

Oslo Municipality, Oslo Municipality, Norway · Exact work coordinates

OpenStreetMap
Field
Astrup Fearnley Museum of Modern ArtAstrup Fearnley Museum of Modern Art

1993 · Oslo Municipality, Oslo Municipality, Norway

UNStudioUNStudio

Arnhem, Gelderland, The Netherlands

Typeworkbureau
Year / years1993Unrecorded
PlaceOslo Municipality, Oslo Municipality, NorwayArnhem, Gelderland, The Netherlands
Place contextOslo Municipality, Oslo Municipality, NorwayRepresentative site: Arnhem, Arnhem, Netherlands
Climate7°C · 14.9h daylight · 5 km/h windClimate unavailable · via Arnhem Centraal railway station
FocusMuseum9 works in corpus
Architects
  • Renzo Piano
  • Ben van Berkel
Linked context

Bureaus

  • Renzo Piano Building Workshop

Notable works

  • Arnhem Centraal railway station
  • Rijksmuseum Twenthe
  • Mercedes-Benz Museum
  • Erasmusbrug
Typologies
  • museum
  • gallery
  • building
  • museum
  • infrastructure
  • housing
  • tower
  • transportation
  • train station
Materials

Not recorded yet.

  • glass
  • steel
  • concrete
Carbon signals

museum and gallery gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.