| Type | work | bureau |
|---|
| Year / years | 1977 | Unrecorded |
|---|
| Place | Sydney, New South Wales, Australia | Arnhem, Gelderland, The Netherlands |
|---|
| Place context | Sydney, New South Wales, Australia | Representative site: Arnhem, Arnhem, Netherlands |
|---|
| Climate | 15°C · 11.1h daylight · 6 km/h wind | 11°C · 14.2h daylight · 9 km/h wind · via Arnhem Centraal railway station |
|---|
| Focus | Office building | 9 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus - Harry Seidler & Associates
| Notable works - Arnhem Centraal railway station
- Rijksmuseum Twenthe
- Mercedes-Benz Museum
- Erasmusbrug
|
|---|
| Typologies | | - building
- museum
- infrastructure
- housing
- tower
- transportation
- train station
|
|---|
| Materials | | |
|---|
| Carbon signals | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. | Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
| - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
- Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
- Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
|
|---|
| Accessibility | Access not recorded | 2 of 2 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|