saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Seoul Olympic Stadium in Seoul, South Korea
Seoul Olympic Stadium

1984 · Seoul, Seoul, South Korea

Seoul Olympic Stadium image

Stadium in Seoul, South Korea

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Seoul Olympic Stadium

Seoul, Seoul, South Korea · Exact work coordinates

OpenStreetMap
Field
Seoul Olympic StadiumSeoul Olympic Stadium

1984 · Seoul, Seoul, South Korea

Togo MuranoTogo Murano

1930 · Osaka, Osaka Prefecture, Japan

Typeworkbureau
Year / years19841930
PlaceSeoul, Seoul, South KoreaOsaka, Osaka Prefecture, Japan
Place contextSeoul, Seoul, South KoreaRepresentative site: Kashihara, Kashihara, Japan
Climate11°C · 13.4h daylight · 3 km/h wind22°C · 13.3h daylight · 6 km/h wind · via Kashiharajingū-mae Station
FocusArchitecture3 works in corpus
Architects
  • Kim Swoo-geun
  • Togo Murano
Linked context

Bureaus

  • SPACE Group of Korea

Notable works

  • Kashiharajingū-mae Station
  • Abeno Harukas
  • Nissay Theatre
Typologies
  • sports venue
  • building
  • tower
  • performance venue
Materials

Not recorded yet.

  • concrete
  • glass
  • steel
  • plaster
  • timber
Carbon signals

sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.