saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Ito-toren in Amsterdam, Netherlands
Ito-toren

2005 · Amsterdam, Amsterdam, Netherlands

Ito-toren image

Offices in Amsterdam

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Ito-toren

Amsterdam, Amsterdam, Netherlands · Exact work coordinates

OpenStreetMap
Field
Ito-torenIto-toren

2005 · Amsterdam, Amsterdam, Netherlands

Togo MuranoTogo Murano

1930 · Osaka, Osaka Prefecture, Japan

Typeworkbureau
Year / years20051930
PlaceAmsterdam, Amsterdam, NetherlandsOsaka, Osaka Prefecture, Japan
Place contextAmsterdam, Amsterdam, NetherlandsRepresentative site: Kashihara, Kashihara, Japan
Climate7°C · 14.3h daylight · 7 km/h wind22°C · 13.2h daylight · 13 km/h wind · via Kashiharajingū-mae Station
FocusOffice building3 works in corpus
Architects
  • Toyo Ito
  • Togo Murano
Linked context

Bureaus

  • Toyo Ito & Associates, Architects

Notable works

  • Kashiharajingū-mae Station
  • Abeno Harukas
  • Nissay Theatre
Typologies
  • office
  • building
  • tower
  • performance venue
Materials

Not recorded yet.

  • concrete
  • glass
  • steel
  • plaster
  • timber
Carbon signals

office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityAccess not recorded1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.