saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Garellano in Bilbao, Spain
Garellano

Unknown · Bilbao, Bilbao, Spain

Garellano image

Skyscraper complex in Bilbao, Spain

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Garellano

Bilbao, Bilbao, Spain · Exact work coordinates

OpenStreetMap
Field
GarellanoGarellano

Unknown · Bilbao, Bilbao, Spain

Togo MuranoTogo Murano

1930 · Osaka, Osaka Prefecture, Japan

Typeworkbureau
Year / yearsUnknown1930
PlaceBilbao, Bilbao, SpainOsaka, Osaka Prefecture, Japan
Place contextBilbao, Bilbao, SpainRepresentative site: Kashihara, Kashihara, Japan
Climate16°C · 13.7h daylight · 1 km/h wind20°C · 13.2h daylight · 11 km/h wind · via Kashiharajingū-mae Station
FocusHousing3 works in corpus
Architects
  • Richard Rogers
  • Togo Murano
Linked context

Bureaus

  • Rogers Stirk Harbour + Partners

Notable works

  • Kashiharajingū-mae Station
  • Abeno Harukas
  • Nissay Theatre
Typologies
  • housing
  • performance venue
  • tower
  • building
  • tower
  • performance venue
Materials

Not recorded yet.

  • concrete
  • glass
  • steel
  • plaster
  • timber
Carbon signals

housing, performance venue, and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Use classification and product-level EPD research to place this material more precisely.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.