saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Sevilla Tower in Seville, Spain
Sevilla Tower

2014 · Seville, Seville, Spain

Sevilla Tower image

Skyscraper in Seville, Spain

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Sevilla Tower

Seville, Seville, Spain · Exact work coordinates

OpenStreetMap
Field
Sevilla TowerSevilla Tower

2014 · Seville, Seville, Spain

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / years20141981
PlaceSeville, Seville, SpainMexico City, Mexico City, Mexico
Place contextSeville, Seville, SpainRepresentative site: Mexico City, Mexico City, Mexico
Climate18°C · 13.4h daylight · 5 km/h wind13°C · 12.7h daylight · 1 km/h wind · via Kurimanzutto
FocusOffice building2 works in corpus
Architects
  • César Pelli
  • Alberto Kalach
Linked context

Bureaus

  • Cesar Pelli & Associates

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • tower
  • office
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

tower and office gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.