saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Portuguese Church, Mumbai in Mumbai, India
Portuguese Church, Mumbai

Unknown · Mumbai, Mumbai, India

Portuguese Church, Mumbai image

Church in Mumbai, India

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Portuguese Church, Mumbai

Mumbai, Mumbai, India · Exact work coordinates

OpenStreetMap
Field
Portuguese Church, MumbaiPortuguese Church, Mumbai

Unknown · Mumbai, Mumbai, India

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / yearsUnknown1981
PlaceMumbai, Mumbai, IndiaMexico City, Mexico City, Mexico
Place contextMumbai, Mumbai, IndiaRepresentative site: Mexico City, Mexico City, Mexico
Climate29°C · 12.7h daylight · 6 km/h windClimate unavailable · via Kurimanzutto
FocusSacred building2 works in corpus
Architects
  • Charles Correa
  • Alberto Kalach
Linked context

Bureaus

  • Charles Correa Associates

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • church
  • sacred space
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

church and sacred space gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.