saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Nissay Theatre in Yūrakuchō, Japan
Nissay Theatre

1963 · Yūrakuchō, Yūrakuchō, Japan

Nissay Theatre image

Theater in Chiyoda Ward, Tokyo, Japan

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Nissay Theatre

Yūrakuchō, Yūrakuchō, Japan · Exact work coordinates

OpenStreetMap
Field
Nissay TheatreNissay Theatre

1963 · Yūrakuchō, Yūrakuchō, Japan

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / years19631981
PlaceYūrakuchō, Yūrakuchō, JapanMexico City, Mexico City, Mexico
Place context日比谷, 有楽町一丁目, 千代田区, 日本Representative site: Calle Gobernador Rafaél Rebollar, San Miguel Chapultepec 1ª Sección, Ciudad de México, Ciudad de México, México
Climate17°C · 13.3h daylight · 8 km/h wind15°C · 12.7h daylight · 3 km/h wind · via Kurimanzutto
FocusPerformance venue2 works in corpus
Architects
  • Togo Murano
  • Alberto Kalach
Linked context

Bureaus

  • Togo Murano

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • performance venue
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.