saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Itatiaia Building in Campinas, Brazil
Itatiaia Building

1957 · Campinas, Campinas, Brazil

Itatiaia Building image

Building in São Paulo, Brazil

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Itatiaia Building

Campinas, Campinas, Brazil · Exact work coordinates

OpenStreetMap
Field
Itatiaia BuildingItatiaia Building

1957 · Campinas, Campinas, Brazil

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / years19571981
PlaceCampinas, Campinas, BrazilMexico City, Mexico City, Mexico
Place contextRua Coronel Rodovalho, Centro, Campinas, São Paulo, BrasilRepresentative site: Calle Gobernador Rafaél Rebollar, San Miguel Chapultepec 1ª Sección, Ciudad de México, Ciudad de México, México
Climate30°C · 11.4h daylight · 11 km/h wind28°C · 12.8h daylight · 2 km/h wind · via Kurimanzutto
FocusHousing2 works in corpus
Architects
  • Oscar Niemeyer
  • Alberto Kalach
Linked context

Bureaus

  • Oscar Niemeyer

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • housing
  • tower
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

housing and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.