saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Isozaki Atea in Bilbao, Spain
Isozaki Atea

2008 · Bilbao, Bilbao, Spain

Isozaki Atea image

Building in Bilbao, Spain

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Isozaki Atea

Bilbao, Bilbao, Spain · Exact work coordinates

OpenStreetMap
Field
Isozaki AteaIsozaki Atea

2008 · Bilbao, Bilbao, Spain

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / years20081981
PlaceBilbao, Bilbao, SpainMexico City, Mexico City, Mexico
Place contextBilbao, Bilbao, SpainRepresentative site: Mexico City, Mexico City, Mexico
Climate15°C · 13.7h daylight · 1 km/h wind13°C · 12.7h daylight · 2 km/h wind · via Kurimanzutto
FocusHousing2 works in corpus
Architects
  • Arata Isozaki
  • Alberto Kalach
Linked context

Bureaus

  • Arata Isozaki & Associates

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • housing
  • tower
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

housing and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.