saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Flamengo Park in Rio de Janeiro, Brazil
Flamengo Park

1965 · Rio de Janeiro, Rio de Janeiro, Brazil

Flamengo Park image

Largest public park in Rio de Janeiro, Brazil

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Flamengo Park

Rio de Janeiro, Rio de Janeiro, Brazil · Exact work coordinates

OpenStreetMap
Field
Flamengo ParkFlamengo Park

1965 · Rio de Janeiro, Rio de Janeiro, Brazil

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / years19651981
PlaceRio de Janeiro, Rio de Janeiro, BrazilMexico City, Mexico City, Mexico
Place contextRio de Janeiro, Rio de Janeiro, BrazilRepresentative site: Mexico City, Mexico City, Mexico
Climate22°C · 11.5h daylight · 3 km/h wind10°C · 12.7h daylight · 5 km/h wind · via Kurimanzutto
FocusLandscape project2 works in corpus
Architects
  • Roberto Burle Marx
  • Alberto Kalach
Linked context

Bureaus

  • Roberto Burle Marx

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • landscape
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.