saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Firminy Vert in Firminy, France
Firminy Vert

Unknown · Firminy, Firminy, France

Firminy Vert image

Image associated with Firminy Vert.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Firminy Vert

Firminy, Firminy, France · Exact work coordinates

OpenStreetMap
Field
Firminy VertFirminy Vert

Unknown · Firminy, Firminy, France

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / yearsUnknown1981
PlaceFirminy, Firminy, FranceMexico City, Mexico City, Mexico
Place contextFirminy, Firminy, FranceRepresentative site: Mexico City, Mexico City, Mexico
Climate17°C · 13.8h daylight · 13 km/h wind18°C · 12.7h daylight · 3 km/h wind · via Kurimanzutto
FocusSacred building2 works in corpus
Architects
  • Le Corbusier
  • Alberto Kalach
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • church
  • sacred space
  • sports venue
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

church, sacred space, and sports venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.