saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Ars Aevi in Sarajevo, Bosnia and Herzegovina
Ars Aevi

1992 · Sarajevo, Sarajevo, Bosnia and Herzegovina

Ars Aevi image

Art Museum in Sarajevo, Bosnia and Herzegovina

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Ars Aevi

Sarajevo, Sarajevo, Bosnia and Herzegovina · Exact work coordinates

OpenStreetMap
Field
Ars AeviArs Aevi

1992 · Sarajevo, Sarajevo, Bosnia and Herzegovina

Taller de Arquitectura XTaller de Arquitectura X

1981 · Mexico City, Mexico City, Mexico

Typeworkbureau
Year / years19921981
PlaceSarajevo, Sarajevo, Bosnia and HerzegovinaMexico City, Mexico City, Mexico
Place contextSarajevo, Sarajevo, Bosnia and HerzegovinaRepresentative site: Mexico City, Mexico City, Mexico
Climate8°C · 13.8h daylight · 4 km/h wind16°C · 12.7h daylight · 7 km/h wind · via Kurimanzutto
FocusMuseum2 works in corpus
Architects
  • Renzo Piano
  • Alberto Kalach
Linked context

Bureaus

  • Renzo Piano Building Workshop

Notable works

  • Kurimanzutto
  • Biblioteca Vasconcelos
Typologies
  • museum
  • gallery
  • house
  • library
  • cultural building
  • public building
Materials

Not recorded yet.

  • steel
  • glass
  • concrete
Carbon signals

museum gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.