saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Perret tower (Grenoble) in Grenoble, France
Perret tower (Grenoble)

1925 · Grenoble, Grenoble, France

Perret tower (Grenoble) image

Tower in France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Perret tower (Grenoble)

Grenoble, Grenoble, France · Exact work coordinates

OpenStreetMap
Field
Perret tower (Grenoble)Perret tower (Grenoble)

1925 · Grenoble, Grenoble, France

Typeworkbureau
Year / years19251969
PlaceGrenoble, Grenoble, FranceOsaka, Japan
Place contextGrenoble, Grenoble, FranceRepresentative site: Kai, Kai, Japan
Climate17°C · 13.8h daylight · 7 km/h wind17°C · 13.3h daylight · 10 km/h wind · via Ryūō Station
FocusLandscape project27 works in corpus
Architects
  • Auguste Perret
  • Tadao Ando
Linked context

Bureaus

  • Atelier Perret Freres

Notable works

  • Ryūō Station
  • Museum of Arts of Uzbekistan
  • Row House in Sumiyoshi
  • Onomichi City Museum of Art
Typologies
  • tower
  • landscape
  • building
  • museum
  • education
  • campus building
  • residence
  • urban house
  • landscape
  • church
Materials
  • concrete
  • concrete
  • glass
  • steel
Carbon signals

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible21 of 22 recorded works are publicly accessible
Related books

No linked books yet.