saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Onagawa Station in Onagawa, Japan
Onagawa Station

1939 · Onagawa, Onagawa, Japan

Onagawa Station image

Railway station in Onagawa, Miyagi Prefecture, Japan

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Onagawa Station

Onagawa, Onagawa, Japan · Exact work coordinates

OpenStreetMap
Field
Onagawa StationOnagawa Station

1939 · Onagawa, Onagawa, Japan

Typeworkbureau
Year / years19391969
PlaceOnagawa, Onagawa, JapanOsaka, Japan
Place context女川町, 日本Representative site: 甲斐中央線, 甲斐市, 日本
Climate11°C · 13.5h daylight · 11 km/h wind8°C · 13.3h daylight · 3 km/h wind · via Ryūō Station
FocusPerformance venue27 works in corpus
Architects
  • Shigeru Ban
  • Tadao Ando
Linked context

Bureaus

  • Shigeru Ban Architects

Notable works

  • Ryūō Station
  • Museum of Arts of Uzbekistan
  • Row House in Sumiyoshi
  • Onomichi City Museum of Art
Typologies
  • performance venue
  • building
  • museum
  • education
  • campus building
  • residence
  • urban house
  • landscape
  • church
Materials

Not recorded yet.

  • concrete
  • glass
  • steel
Carbon signals

performance venue gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible21 of 22 recorded works are publicly accessible
Related books

No linked books yet.