saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Torre Altus in Mexico City, Mexico
Torre Altus

1998 · Mexico City, Mexico City, Mexico

Torre Altus image

Residential condominiums in Mexico

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Torre Altus

Mexico City, Mexico City, Mexico · Exact work coordinates

OpenStreetMap
Field
Torre AltusTorre Altus

1998 · Mexico City, Mexico City, Mexico

Swan & Maclaren GroupSwan & Maclaren Group

1892 · Singapore, Singapore, Singapore

Typeworkbureau
Year / years19981892
PlaceMexico City, Mexico City, MexicoSingapore, Singapore, Singapore
Place contextMexico City, Mexico City, MexicoRepresentative site: Cecil, Cecil, Singapore
Climate8°C · 12.7h daylight · 5 km/h wind28°C · 12.2h daylight · 5 km/h wind · via Telok Ayer Chinese Methodist Church
FocusHousing10 works in corpus
Architects
  • Augusto H. Alvarez
  • Swan & Maclaren Group
Linked context

Bureaus

  • Augusto H. Álvarez

Notable works

  • Telok Ayer Chinese Methodist Church
  • Goodwood Park Hotel
  • Vanguard Building
  • David Elias Building
Typologies
  • housing
  • tower
  • church
  • sacred space
  • house
  • hospitality
  • landscape
  • education
  • campus building
  • civic building
Materials

Not recorded yet.

  • timber
Carbon signals

housing and tower gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

The recorded material palette leans lower-carbon on paper, but procurement and quantity still matter.

No dominant drivers yet.

Lower-carbon levers

No levers surfaced yet.

  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityAccess not recorded5 of 5 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.