saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

No plan or image is recorded for this slot yet.
Vila Operária da Gamboa

1933 · Rio de Janeiro, Rio de Janeiro, Brazil

Rio de Janeiro, Rio de Janeiro, Brazil

28°C · 11.5h daylight · 10 km/h wind

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Vila Operária da Gamboa

Rio de Janeiro, Rio de Janeiro, Brazil · Exact work coordinates

OpenStreetMap

Vila Operária da Gamboa

Image 1

Rio de Janeiro, Rio de Janeiro, Brazil

Climate: 28°C · 11.5h daylight · 10 km/h wind

Mapping: Exact work coordinates

Field
Vila Operária da Gamboa

1933 · Rio de Janeiro, Rio de Janeiro, Brazil

Souto de Moura ArquitectosSouto de Moura Arquitectos

1980 · Porto, Porto District, Portugal

Typeworkbureau
Year / years19331980
PlaceRio de Janeiro, Rio de Janeiro, BrazilPorto, Porto District, Portugal
Place contextRio de Janeiro, Rio de Janeiro, BrazilRepresentative site: Real, Dume e Semelhe, Real, Dume e Semelhe, Portugal
Climate28°C · 11.5h daylight · 10 km/h wind23°C · 13.6h daylight · 4 km/h wind · via Estádio Municipal de Braga
FocusArchitecture3 works in corpus
Architects
  • Lucio Costa
  • Eduardo Souto de Moura
Linked context

Bureaus

  • Lucio Costa

Notable works

  • Estádio Municipal de Braga
  • Casa das Historias Paula Rego
  • Trindade station (Porto Metro)
Typologies
  • building
  • sports venue
  • museum
  • art museum
  • cultural building
  • civic building
Materials

Not recorded yet.

  • concrete
Carbon signals

building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.