saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

AEG turbine factory in Bezirk Mitte, Germany
AEG turbine factory

1908 · Bezirk Mitte, Bezirk Mitte, Germany

AEG turbine factory image

Factory in Berlin designed by Peter Behrens

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

AEG turbine factory

Bezirk Mitte, Bezirk Mitte, Germany · Exact work coordinates

OpenStreetMap
Field
AEG turbine factoryAEG turbine factory

1908 · Bezirk Mitte, Bezirk Mitte, Germany

Souto de Moura ArquitectosSouto de Moura Arquitectos

1980 · Porto, Porto District, Portugal

Typeworkbureau
Year / years19081980
PlaceBezirk Mitte, Bezirk Mitte, GermanyPorto, Porto District, Portugal
Place contextBezirk Mitte, Bezirk Mitte, GermanyRepresentative site: Real, Dume e Semelhe, Real, Dume e Semelhe, Portugal
Climate6°C · 14.2h daylight · 20 km/h wind14°C · 13.5h daylight · 4 km/h wind · via Estádio Municipal de Braga
FocusArchitecture3 works in corpus
Architects
  • Peter Behrens
  • Eduardo Souto de Moura
Linked context

Bureaus

  • Peter Behrens

Notable works

  • Estádio Municipal de Braga
  • Casa das Historias Paula Rego
  • Trindade station (Porto Metro)
Typologies
  • building
  • sports venue
  • museum
  • art museum
  • cultural building
  • civic building
Materials
  • glass
  • steel
  • concrete
Carbon signals

Steel and Glass look like the main embodied-carbon drivers in the current palette.

  • Steel
  • Glass

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.