saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

25 Martin Place in Sydney, Australia
25 Martin Place

1977 · Sydney, New South Wales, Australia

25 Martin Place image

Seed wave 34 image for 25 Martin Place.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

25 Martin Place

Sydney, New South Wales, Australia · Exact work coordinates

OpenStreetMap
Field
25 Martin Place25 Martin Place

1977 · Sydney, New South Wales, Australia

Souto de Moura ArquitectosSouto de Moura Arquitectos

1980 · Porto, Porto District, Portugal

Typeworkbureau
Year / years19771980
PlaceSydney, New South Wales, AustraliaPorto, Porto District, Portugal
Place contextSydney, New South Wales, AustraliaRepresentative site: Real, Dume e Semelhe, Real, Dume e Semelhe, Portugal
Climate20°C · 11.1h daylight · 15 km/h wind17°C · 13.6h daylight · 10 km/h wind · via Estádio Municipal de Braga
FocusOffice building3 works in corpus
Architects
  • Harry Seidler
  • Eduardo Souto de Moura
Linked context

Bureaus

  • Harry Seidler & Associates

Notable works

  • Estádio Municipal de Braga
  • Casa das Historias Paula Rego
  • Trindade station (Porto Metro)
Typologies
  • tower
  • office
  • sports venue
  • museum
  • art museum
  • cultural building
  • civic building
Materials
  • concrete
  • steel
  • glass
  • concrete
Carbon signals

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
AccessibilityAccess not recorded2 of 2 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.