saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Punjab and Haryana High Court in Chandigarh, India
Punjab and Haryana High Court

1947 · Chandigarh, Chandigarh, India

Punjab and Haryana High Court image

High Court for the states of Punjab and Haryana

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Punjab and Haryana High Court

Chandigarh, Chandigarh, India · Exact work coordinates

OpenStreetMap

Punjab and Haryana High Court

Hero image

High Court for the states of Punjab and Haryana

Credit:

Rights: Unknown · unknown

Field
Punjab and Haryana High CourtPunjab and Haryana High Court

1947 · Chandigarh, Chandigarh, India

Smiljan Radic

Talca, Maule, Chile

Typeworkbureau
Year / years1947Unrecorded
PlaceChandigarh, Chandigarh, IndiaTalca, Maule, Chile
Place contextChandigarh, Chandigarh, IndiaRepresentative site: Talca, Maule, Chile
Climate31°C · 13.1h daylight · 8 km/h windClimate unavailable · via Copper House 2
FocusCivic building2 works in corpus
Architects
  • Le Corbusier
  • Smiljan Radic
  • Smiljan Radic Clarke
Linked context

Bureaus

  • Atelier Le Corbusier

Notable works

  • Copper House 2
  • Mestizo Restaurant
Typologies
  • civic building
  • residential
  • houses
  • hospitality
  • restaurants bars
  • restaurant
  • hotels and restaurants
Materials

Not recorded yet.

  • glass
  • steel
  • wood
  • concrete
Carbon signals

civic building gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers

No levers surfaced yet.

  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
AccessibilityPublicly accessibleAccess not recorded across linked works
Related books

No linked books yet.

No linked books yet.