saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Walt Disney World Dolphin in Florida, United States
Walt Disney World Dolphin

1990 · Florida, Florida, United States

Walt Disney World Dolphin image

Hotel at Walt Disney World

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Walt Disney World Dolphin

Florida, Florida, United States · Exact work coordinates

OpenStreetMap
Field
Walt Disney World DolphinWalt Disney World Dolphin

1990 · Florida, Florida, United States

Santiago CalatravaSantiago Calatrava

New York, United States

Typeworkbureau
Year / years1990Unrecorded
PlaceFlorida, Florida, United StatesNew York, United States
Place contextFlorida, Florida, United StatesRepresentative site: Loiu, Loiu, Spain
Climate20°C · 13.0h daylight · 18 km/h wind15°C · 13.7h daylight · 2 km/h wind · via Bilbao Airport
FocusPerformance venue47 works in corpus
Architects
  • Michael Graves
  • Santiago Calatrava
Linked context

Bureaus

  • Michael Graves Architecture & Design

Notable works

  • Bilbao Airport
  • Westfield World Trade Center
  • Athens Olympic Sports Complex
  • Olympic Stadium (Athens)
Typologies
  • performance venue
  • hospitality
  • transport hub
  • performance venue
  • building
  • sports venue
  • infrastructure
  • tower
  • landscape
  • civic building
Materials
  • timber
  • steel
  • glass
  • concrete
Carbon signals

The recorded material palette leans lower-carbon on paper, but procurement and quantity still matter.

No dominant drivers yet.

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Track sourcing, certification, and assembly logic rather than assuming timber is automatically low impact.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible16 of 16 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.