saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Pinacoteca Giovanni e Marella Agnelli

Turin, Turin, Italy · Exact work coordinates

OpenStreetMap
Field
Pinacoteca Giovanni e Marella AgnelliPinacoteca Giovanni e Marella Agnelli

2002 · Turin, Turin, Italy

Santiago CalatravaSantiago Calatrava

New York, United States

Typeworkbureau
Year / years2002Unrecorded
PlaceTurin, Turin, ItalyNew York, United States
Place contextTurin, Turin, ItalyRepresentative site: Loiu, Loiu, Spain
Climate19°C · 13.8h daylight · 7 km/h wind25°C · 13.7h daylight · 9 km/h wind · via Bilbao Airport
FocusArchitecture47 works in corpus
Architects
  • Renzo Piano
  • Santiago Calatrava
Linked context

Bureaus

  • Renzo Piano Building Workshop

Notable works

  • Bilbao Airport
  • Westfield World Trade Center
  • Athens Olympic Sports Complex
  • Olympic Stadium (Athens)
Typologies
  • gallery
  • transport hub
  • performance venue
  • building
  • sports venue
  • infrastructure
  • tower
  • landscape
  • civic building
Materials
  • steel
  • steel
  • glass
  • concrete
Carbon signals

Steel look like the main embodied-carbon drivers in the current palette.

  • Steel

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible16 of 16 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.