saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Alan I W Frank House in Pittsburgh, United States
Alan I W Frank House

1940 · Pittsburgh, Pittsburgh, United States

Alan I W Frank House image

House in Pittsburgh, Pennsylvania

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Alan I W Frank House

Pittsburgh, Pittsburgh, United States · Exact work coordinates

OpenStreetMap
Field
Alan I W Frank HouseAlan I W Frank House

1940 · Pittsburgh, Pittsburgh, United States

SANAASANAA

1995 · Tokyo, Japan

Typeworkbureau
Year / years19401995
PlacePittsburgh, Pittsburgh, United StatesTokyo, Japan
Place contextPittsburgh, Pittsburgh, United StatesRepresentative site: Hitachi, Hitachi, Japan
Climate4°C · 13.5h daylight · 17 km/h wind15°C · 13.3h daylight · 10 km/h wind · via Hitachi Station
FocusHousing11 works in corpus
Architects
  • Marcel Breuer
  • Kazuyo Sejima
  • Ryue Nishizawa
Linked context

Bureaus

  • Marcel Breuer Associates

Notable works

  • Hitachi Station
  • New Museum
  • 21st Century Museum of Contemporary Art, Kanazawa
  • Towada Art Center
Typologies
  • housing
  • house
  • performance venue
  • museum
  • cultural building
  • gallery
  • university building
  • learning center
  • academic building
  • landscape
Materials

Not recorded yet.

  • glass
  • aluminum
  • steel
  • concrete
  • timber
Carbon signals

housing and house gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Aluminum, Concrete, and Steel look like the main embodied-carbon drivers in the current palette.

  • Aluminum
  • Concrete
  • Steel
Lower-carbon levers

No levers surfaced yet.

  • Focus on recycled content, lighter assemblies, and careful facade-specification choices.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityAccess not recorded10 of 10 recorded works are publicly accessible
Related books

No linked books yet.