saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Perret tower (Grenoble) in Grenoble, France
Perret tower (Grenoble)

1925 · Grenoble, Grenoble, France

Perret tower (Grenoble) image

Tower in France

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Perret tower (Grenoble)

Grenoble, Grenoble, France · Exact work coordinates

OpenStreetMap
Field
Perret tower (Grenoble)Perret tower (Grenoble)

1925 · Grenoble, Grenoble, France

Rojkind ArquitectosRojkind Arquitectos

Ciudad de México, Distrito Federal, Mexico

Typeworkbureau
Year / years1925Unrecorded
PlaceGrenoble, Grenoble, FranceCiudad de México, Distrito Federal, Mexico
Place contextGrenoble, Grenoble, FranceRepresentative site: Ciudad de México, Distrito Federal, Mexico
Climate16°C · 13.8h daylight · 1 km/h windClimate unavailable · via Nestlé Chocolate Museum
FocusLandscape project4 works in corpus
Architects
  • Auguste Perret
  • Michel Rojkind
Linked context

Bureaus

  • Atelier Perret Freres

Notable works

  • Nestlé Chocolate Museum
  • High Park
  • Liverpool Interlomas
  • Mercado Roma
Typologies
  • tower
  • landscape
  • cultural
  • museums exhibit
  • museum
  • museums and libraries
  • mixed use
  • house
  • civic building
  • building
Materials
  • concrete
  • glass
  • steel
  • concrete
Carbon signals

Concrete look like the main embodied-carbon drivers in the current palette.

  • Concrete

Concrete, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Concrete
  • Steel
  • Glass
Lower-carbon levers
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.
AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.