saved.archi

your architecture companion

Compare

Compare works, bureaus, or a mixed set

Read a small selection side by side through images, place context, climate, typology, materials, carbon signals, accessibility, and related books.

1 selected · 1 other item held elsewhere in the compare set

1 selected · 1 other item held elsewhere in the compare set

The selected works stay in sync by slot, while the pins map where they sit inside the mixed set.

Institut du monde arabe in 5th arrondissement of Paris, France
Institut du Monde Arabe

1987 · Paris, Ile-de-France, France

Institut du monde arabe image

Cultural organization

Site spread

Pins are normalized from the recorded work coordinates so you can read the set spatially.

Institut du Monde Arabe

Paris, Ile-de-France, France · City-level coordinates only

OpenStreetMap
Field
Institut du Monde Arabe

1987 · Paris, Ile-de-France, France

Roberto Burle MarxRoberto Burle Marx

1932 · Rio de Janeiro, Rio de Janeiro, Brazil

Typeworkbureau
Year / years19871932
PlaceParis, Ile-de-France, FranceRio de Janeiro, Rio de Janeiro, Brazil
Place contextParis, Ile-de-France, FranceRepresentative site: Rio de Janeiro, Rio de Janeiro, Brazil
Climate7°C · 14.1h daylight · 10 km/h wind23°C · 11.5h daylight · 1 km/h wind · via Flamengo Park
FocusCultural institute1 works in corpus
Architects
  • Jean Nouvel
  • Roberto Burle Marx
Linked context

Bureaus

  • Ateliers Jean Nouvel

Notable works

  • Flamengo Park
Typologies
  • cultural center
  • institutional building
  • museum
  • landscape
Materials
  • glass
  • steel
  • aluminum

Not recorded yet.

Carbon signals

Aluminum, Steel, and Glass look like the main embodied-carbon drivers in the current palette.

  • Aluminum
  • Steel
  • Glass

landscape gives us a typology starting point even though the work does not have a recorded material palette yet.

No dominant drivers yet.

Lower-carbon levers
  • Focus on recycled content, lighter assemblies, and careful facade-specification choices.
  • Prioritize recycled content, efficient sections, and procurement-specific EPD comparisons.
  • Compare system-level facade options, reduce overspecification, and pair glass choices with structural reductions.

No levers surfaced yet.

AccessibilityPublicly accessible1 of 1 recorded works are publicly accessible
Related books

No linked books yet.

No linked books yet.