| Type | work | bureau |
|---|
| Year / years | 1923 | 1932 |
|---|
| Place | Le Raincy, Le Raincy, France | Rio de Janeiro, Rio de Janeiro, Brazil |
|---|
| Place context | Le Raincy, Le Raincy, France | Representative site: Rio de Janeiro, Rio de Janeiro, Brazil |
|---|
| Climate | 15°C · 14.0h daylight · 8 km/h wind | 27°C · 11.5h daylight · 9 km/h wind · via Flamengo Park |
|---|
| Focus | Sacred building | 1 works in corpus |
|---|
| Architects | | |
|---|
| Linked context | Bureaus | Notable works |
|---|
| Typologies | | |
|---|
| Materials | | Not recorded yet. |
|---|
| Carbon signals | Concrete look like the main embodied-carbon drivers in the current palette. | landscape gives us a typology starting point even though the work does not have a recorded material palette yet. No dominant drivers yet. |
|---|
| Lower-carbon levers | - Look for lower-clinker mixes, reused structure, and scope reductions before fine-grained product swaps.
| No levers surfaced yet. |
|---|
| Accessibility | Publicly accessible | 1 of 1 recorded works are publicly accessible |
|---|
| Related books | No linked books yet. | No linked books yet. |
|---|